Isfahan Refinery
Refinery manager
( A~E)
1398/11/30
100,000,000 tomen
1399/12/30
Brief description of the project:
Isfahan Refinery Process Development and Optimization Plan was defined in 5 packages (A ~ E) with the following objectives:
Reduction of production of heavy products (fuel oil) and increase of production of light and valuable products (mainly “gasoline”) by constructing new process units, improving the quality of main products (gasoline, kerosene and gas oil) in accordance with European petroleum products standard by constructing units Required process, stabilization of the optimal refining capacity at 373,000 barrels per day and increase operational flexibility by constructing a new distillation unit.
Mapna scope (package C): including construction operations, supply of equipment, installation and pre-commissioning of units: production and distribution of electricity and steam, water supply, refueling, instrumentation and service air, communications of process units and nitrogen distribution, refineries Water, industrial and sanitary effluents, flares and cylindrical and spherical tanks of the refinery and the execution of all relevant buildings).
Client: National Iranian Oil Engineering Company
Mapna scope (package C): including construction operations, equipment supply, installation and pre-commissioning of units: production and distribution of electricity and steam, water supply, refueling, instrumentation and service air, communications of process units and nitrogen distribution, refineries Water, industrial and sanitary effluents, flares and cylindrical and spherical tanks of the refinery and the execution of all relevant buildings).
Client: National Iranian Oil Engineering Company
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit elit, luctus nec ullamcorper mattis, dapibus leo pulvinar.
Categories:
south ParsTags:
10 روز
فرودگاه پیام - کرج
We respect your privacy and send you important emails
(During business hours)
Leave a Reply